Permits & Fees

Fees - Updated 10/20/2025


Encroachment

  • Encroachment Permit Review/Processing Flat Fee - $167.85 each
  • Wet Utility Structure - $864.15 each
  • Dry Utility Structure - $357.40 each
  • Backflow Inspection - $206 each
  • Street Cut - $451.10 each
  • Driveway / Sidewalk - $451.10 each
  • Curb Core - $215.25 each
  • Traffic Control Only - $451.10 first day
  • Traffic Control - $262.65 each additional day
  • Traffic Control - $640.65 each overnight/weekend fee
  • Traffic Control Plan Review - $78.25 each sheet  
  • Traffic Control (Complex Project) - $5,000 required deposit/fee is actual cost
  • Public Right of Way - $451.10 each
  • USA Marking Removal - $215.25 per location on public property
  • Utility Plan Review - $257.50 each

Transportation

  • Single Trip - $16 each
  • Annual Permit - $90 each

Well

  • Utility Structure - $250 for the first well; $125 each additional well
  • Probe Surveys - $509 (unlimited)
  • Abandonment - $438 for the first well; $216 each additional well at the same location
  • USA Marking Removal - $215.25 per location on public property

Construction Hydrant 

  • Construction Water Meter Deposit - $2500 - Collected by the Water Department (714) 593-4420
  • Hydrant Water Meter Installation Fee - $295 each
  • Water Usage Deposit - $500 minimum - Collected by the Water Department (714) 593-4420
  • Hydrant Water Meter Relocation - $176 each

Newspaper Rack

Annual Encroachment Permit Required  

  • First News Rack - $243
  • Each Additional News Rack - $88

Parkway Tree Removal / Replacement

  • Tree Removal by homeowner (Encroachment Permit Required)
  • Tree Removal by City - $ 820.90
  • New or Replacement Tree by City - $ 658.15
  • Tree Removal and New/Replacement Tree by City - $1,479.05

Permits